20260512135201810

Sliding Table Saw ZD400T

High-performance Sliding Table Saw for accurate cutting of MDF, plywood, solid wood and panel materials. Featuring a precision sliding table, powerful saw unit and stable structure, it provides efficient cutting solutions for furniture factories, cabinet makers and woodworking professionals.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • Sliding Table Saw ZD400T

product description

ModelZD400T
Dimension of sliding table3200x415 mm
Gross cut capacity3200 mm
Width of cut between saw blade and rip fence1250 mm
Tilting saw group45°~90°Manual
Lifting saw groupElectrical
Display of angleDigital
Diameter of main saw blade400 mm
Max cutting height 90°/ 45°120mm/80mm
Speed of main saw spindle3000/4000/5000 r.p.m
Main saw motor power5.5 kw
Main spindle diameter30 mm
Diameter of scoring saw blade120 mm
Speed of scoring saw spindle8000 r.p.m
Scoring saw motor power1.1 kw
Scoring saw spindle diameter22 mm
Cast iron workbench dimension1065*650mm
Extended workbench dimension1050*840mm/580*740mm
Gross weight1100 KGS
Overall dimension3250x3150x900 mm


  • Control panel
    Control panel
  • Double saw blades
    Double saw blades
  • Guide-rail-structure-motor
    Guide-rail-structure-motor
  • 细节图 (2)
    Big Dust Hood
  • zd400t_03
    Finished product photo
  • zd400t_04
    Finished product photo

Demo Video

Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit