20260512135201810

Planer Sanding Machine

The planer sanding machine combines thickness planing and sanding functions to provide smooth and accurate wood surface finishing. It is widely used for solid wood, MDF, plywood, and furniture production, offering high efficiency, stable performance, and excellent sanding results for professional woodworking applications.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • Planer Sanding Machine
  • Planer Sanding Machine

product description

ModelZDP-R-RP630ZDP-R-RP1000ZDP-R-RP1300
Max working width630mm1000mm1300mm
Material thickness10-100mm10-100mm10-100mm
Min. Working length500mm(option400mm)500mm(option400mm)550mm(option400mm)
Feeding speed5-25m/min5-25m/min5-25m/min
Size of sanding belt650*1900mm1020*2020mm1320*2020mm
Total power29.5kw41kw81kw
Working air pressure0.6mpa0.6mpa0.6mpa
Volume of dust collecting6500m³/h15000m³/h15000m³/h
Speed of dust collecting25-30m/s25-30m/s25-30m/s
Overall dimension
(L*W*H)
1450*2450*2050mm1750*2450*2050mm2150*3000*2050mm
Weight3000kg3600kg4500kg



Demo Video

Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit