20260512135201810

CNC Door Lock and hinge milling machine

Qingdao Zhongding CNC Door Lock and Hinge Milling Machine is a professional woodworking machine designed for automatic machining of door lock holes, hinge slots, handle holes, and other hardware openings on wooden doors.
The CNC Door Lock Machine adopts advanced CNC control technology to achieve accurate positioning, fast processing speed, and consistent machining quality. It is widely used in wooden door factories, interior door manufacturers, furniture factories, and customized door production lines.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • CNC Door Lock and hinge milling machine

product description

Model

ZD1226

Dimension

3700*1700*1600mm

Side slotting motor

6KW

Weight

1000kg

Side drilling motor

2.2KW

Power

14.5kw

Upper drilling motor

2.2KW

Max.working length

2800mm

Upper slotting motor

2.2KW

Max. slotting depth

130mm

Servo drive motor

750W+750+400W

Max. slotting width

80mm

Guide

ASK

Slotting spindle speed

18000/r/min

Rear

TWIWAN TE

Motor

SHUNTONG WTD

Frequency convetor

JIALE

Drive controllor

LUOLUNCHI

Reducer

TWIWAN TE



Demo Video

Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit