20260512135201810

Six Sides CNC Drilling Machine

High-performance 6 Side CNC Drilling Machine for automatic drilling and processing of MDF, plywood and wood panels. Featuring six-side drilling capability, precise positioning and efficient production performance, it is the ideal solution for cabinet makers, furniture manufacturers and intelligent woodworking factories.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • Six Sides CNC Drilling Machine

product description

ModelZD2812/ZD2812S
Processing rangeLength(mm)150~2800
Width(mm)50~1200
Thickness(mm)10~60
Max. moving speedX、U(m/min)120
Y、W(m/min)80
Z、A(m/min)30
Total Powerkw22
Drilling packageQuantity1(2)
Drill bit strokeL=60mm
Spindle ConfigurationCC 2.2kw 4000RPM
Upper vertical drills Qty.12pcs(+12pcs)
Upper horizontal drills Qty.8pcs(+8pcs)
Lower vertical drill Qty.9pcs
Drill diameter(mm)Φ35
Drill bit spacing(mm)32
SpindleSpindle ConfigurationCC 3.5kw 18000RPM  ER25
Quantity2(3)
Driving motorEston absolute value servo
DriverEston Absolute Drive
Frequency controlEDT 3.7kw adjustment frequency
WorkbenchAir floating tabletop High pressure blower 0.75kw
WorkbenchAir floating tabletop
High pressure blower 0.75kw
Control systemHigerman system
ReducerJapan Shimpo
Guide railTaiwan square rail
Rack gearGerman high-precision helical gears
PositionAutomatic positioning system
Side closingAutomatic side close
Electric wireHighly flexible cable
Machine bedHeavy lathe bed annealed
Dust collecting pipeThe upper suction port is φ200mm; the lower suction port is φ125mm.



产品示意图


  • Linear tool magazine
    Linear tool magazine
  • Rear-discharge-turning-line
    Rear-discharge-turning-line
  • Double-drilling-magazine
    Double-drilling-magazine

Demo Video

Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit