20260512135201810

ZD1325 CNC Nesting Machine

High-performance ATC CNC Router with automatic tool changing system for furniture, cabinet and woodworking production. It offers fast tool switching, precise machining and stable operation for cutting, drilling, engraving and carving MDF, plywood and solid wood materials.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • ZD1325 CNC Nesting Machine

product description

Model

ZD1325

Working travel

1300*2500*200mm

Main Spindle

HQD/CC 9kw Spindle, Air cooling/24000RPM

Tools change method

Automatic liner tools magazine 12 sections

(Optional Disc magazine 16sections)

Unload speed

50m/min(MAX)

Working speed

30m/min(MAX)

Positioning accuracy

±0.02 mm

Workbench

Vacuum adsorption double-layer table

Control system

Taiwan SYNTEC/WEIHONG

Reducer

Japan SHIMPO NS grade helical gear reducer

Driver motor

XYZ axis are SYNETC/WEIHONG bus servo motor. 1kw

Frequency converter

Taiwan FULING high power inverter

Guide rails and slides

Taiwan HIWIN/Italy PEK-30mm

Ball screw

Taiwan TBI double thread high precision

Rack and pinion

Taiwan M1.5 alloy hard-toothed helical rack + alloy hard-toothed helical gear

Targeting

High-precision automatic positioning cylinder φ30mm*7PCS

Lubrication system

Intelligent timing centralized lubrication


  • Automaitc-loading&discharing
    Automaitc loading & discharing
  • DISC-TOOL-Magazine
    DISC TOOL Magazine
  • Drilling bits magazine
    Drilling bits magazine
  • Independent-labeling
    Independent labeling
  • Angle-arbor-
    Angle arbor
  • Laser fence protection
    Laser fence protection

Demo Video

Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit