20260512135201810

CA-1530 CNC Wood Lathe

Qingdao Zhongding CNC Wood Lathe Machine is a professional woodworking machine designed for automatic turning and shaping of solid wood components.
The CNC Wood Turning Lathe adopts CNC control technology to produce accurate and consistent wooden parts with high efficiency. It is widely used for manufacturing furniture legs, stair components, wooden columns, decorative parts, and customized wood products.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • CA-1530 CNC Wood Lathe

product description

Model                      CA-1530

Max processing length

1500mm(can custom 1500/2000/3000mm)

Max turning diameter

300mm

Air pressure

0.6-0.8Mpa

Powersupply

AC 380V 3 phase 50HZ/60HZ(can custom 220V)

Max feed rate

200cm/min

min setting unit

0.01cm

Transimission type

ballscrew for X Z axis,gear for Y axis

Guider

Taiwan Hiwin orbit

Main shaft rotating speed

0-3000r/min

Motor power

4kw

Cutter material

Super hard alloy

Control System

DSP control system(LCD Control Panel optional)

Motor

Stepper motor  

Driver

Yako driver  

Inverter

DELTA inverter

Package Size

3100*1100*1700mm

G.W

1750KG


Demo Video


Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit