20260512135201810

Double Sided Planer

Qingdao Zhongding Industrial Woodworking Planer for High Precision Thickness Calibration
Double Sided Planer Machine is a high-efficiency woodworking machine designed for simultaneous top and bottom surface planing. It can process two sides of wood materials in one pass, improving production efficiency and ensuring accurate thickness control for solid wood furniture, flooring, doors, and panel manufacturing.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • Double Sided Planer

product description

Model

MB204HL

MB206HL

Max processing width

410mm

610MM

Max. process thickness

200mm

200mm

Min. process length

260mm

260mm

Max planning depth(Top spindle)

8mm

8mm

Max planning depth(Bottom spindle)

5mm

5mm

Feeding speed

4-16m/min

4-16m/min

Spindle Speed

5000r/min

5000r/min

Upper&Bottom Spindle power

7.5KW/7.5KW

11/7.5KW

Feeding motor power

2.2KW

3KW

Lifting motor power

0.37KW

0.37KW

Machine size

2250*900*1700mm

2250*1000*1700mm

Weight

2450KG

2800KG


Demo Video

Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit