20260512135201810

Vacuum membrane laminating machine

Qingdao Zhongding Vacuum Membrane Laminating Machine is a professional woodworking machine designed for PVC film wrapping, decorative panel production, cabinet door manufacturing, and furniture component processing.
The machine uses advanced vacuum pressing technology to apply PVC, PET, veneer, and decorative films onto MDF boards, wooden doors, cabinet doors, and various shaped panels. With uniform pressure, stable heating performance, and precise temperature control, it ensures high-quality surface finishing and strong adhesion.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • Vacuum membrane laminating machine

product description

Models

ZD2480H/2480H-2(Optional dual beds)

Dimensions

7300*2000*1800mm/10300*2000*1800 mm

Working table surface

1300*2500mm/+1100*2500 mm

Max working height

60mm

Rated working pressure

Negative pressure>0.095Mpa

Installed capacity

45KW(actual consumption 9kw)

Vacuum pump

140 vacuum pump + three-capacity double gas tank

(140 m³ per hour to reach pressure)

Weight

2600kg/2800kgs

Heating

Metal five-sided aluminum row heating + multi-point auxiliary heating + heating under the workbench

Work form

One-key start + automatic entry and exit + regular heating + automatic suction

Transmission system

Rack drive + motor reducer + linear guide + frequency converter

Features

Cooling fan + Film roller support+Auto film cutting


Demo Video

Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit