20260512135201810

BEAM SAW MJ6226

This Beam Saw is an efficient panel cutting solution for furniture manufacturers and woodworking companies. It is suitable for cutting MDF, plywood, particle board, melamine board, and other engineered wood panels.
The machine provides accurate cutting performance, simple operation, and reliable productivity. Its robust construction and precise positioning system help manufacturers achieve consistent panel dimensions while improving workshop efficiency.
The beam saw machine is widely used for the production of kitchen cabinets, wardrobes, office furniture, and customized furniture.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • BEAM SAW MJ6226

product description

Model

MJ6226

Control panel

Delta touch screen

Working table type

Air flotation table

Main spindle rotation speed

5600r/min

Scoring spindle rotation speed

8500r/min

Max. Working thickness

70mm

Max. Working length

2600mm

Diameter of main spindle

30mm

Diameter of main saw blade

355mm

Diameter of scoring spindle

25.4mm

Diameter of scoring saw blade

160mm

Speed adjustment

0-45m/min(frequency conversion)

Total power

9kw+1.5kw

Blower power

1.5kw

Overall dimension

5200*3550*1750mm

Weight

3000kg


  • 471a1c5ff8fce947cc28887b7830d138
    Touch screen control system
    The operation is safe and reliable, the interface is simple, and it has complete operation instructions and troubleshooting guidelines. It can edit and manage the sawing plan, edit and manage the sawing tasks, and simulate the execution of sawing. Compatible and integrated with a variety of sawing optimization software, barcode management software, and factory automation software.
  • 3
    Circuit control system
    The electrical parts are all made of internationally renowned brands to ensure the stability and durability of the electronic saw.
  • 4
    Alloy double saw blade
    Large saw screw locking device or pneumatic lock clamp (optional), large and small saws are installed vertically, the verticality is accurate, the assembly does not need to be adjusted, and it is ready to use.
  • 5
    Quenching and sanding the fuselage
    The fuselage adopts calcining process to thicken the fuselage. The motor's carriage, cast iron is too easy to break, so we changed it to calcined and thickened steel plate. Greater stability and no breakage.

Demo Video

Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit