20260512135201810

HEAVY DUTY CNC BEAM SAW ZD330

CNC BEAM SAW designed for automatic and precise cutting of wood panels, MDF, plywood and laminate boards. With intelligent CNC control, automatic feeding system and high cutting accuracy, this panel saw machine is the ideal choice for furniture manufacturers, cabinet factories and professional woodworking production lines.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • HEAVY DUTY CNC BEAM SAW ZD330

product description

ModelZD330
Max.Sawing length3300mm
Max.Sawing width3300mm
Sawing thickness120mm
Dia. Of main saw blade/Speed400mm(450mm option)/3800rpm
Axis Dia. of Main saw blade75mm
Dia. of grooving saw blade/Speed200mm/5200rpm
Axis Dia. of grooving saw blade50mm
Main saw motor power15 kw
Scoring saw motor power2.2kw
Saw carriage drive 聽motor2kw servo
Robot clamper drive motor2kw servo
Sawing speed0~120m/min
Return speed0~120m/min
Quantity of Robot Clamp9
Air floating bench size1870*540mm
Air floating power3kw
Sawing accuracy卤0.05mm
Servo targeting accuracy卤0.02mm
Air pressure0.6-0.7Mpa
Weight5500kgs
Dimensions (L*W*H)6550*5650*1950mm


cnc-beam-panel-saw_06

Intelligent industrial computer

Touch screen operation, compatible with a variety of sawing optimization software, barcode management software and factory automation software.,easy operation.

Mechanical Gripper

Technology pneumatic, two-finger gripper controlled by an intelligent system ensures precise sawing without damaging the workpiece surface.

cnc-beam-panel-saw_07
cnc-beam-panel-saw_05

Heavy-duty frame

Frame has gone through more than a dozen processes such as annealing , and adopts high-precision gantry CNC processing .Strong and durable, ensures long-term stable operation of the equipment.

Letter Saw Blade.

The small saw first draws the slot and then the big saw cuts toprevent edge bursting, Each is drven and lifted independently to make the cutting more powerful.

cnc-beam-panel-saw_04
cnc-beam-panel-saw_08

Extended Bakelite air floating

Made of imported bakelite and air floating beads, which effectively ensures the processing of sensitive decorative panels and prevents scratches on the panels, easier movement.

Automatic lifting beam and side support

The pressure beam lifting distance can be adjusted according to the thickness of the plate automatically, reducing the cylinder's empty stroke and improving the sawing efficiency and sawing flatness.

cnc-beam-panel-saw_03

Demo Video

Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit