20260512135201810

Wide Belt Calibration Sanding Machine

The Wide Belt Calibration Sanding Machine provides accurate thickness calibration and superior surface finishing for wood panels. It is widely used in furniture production, panel processing, and woodworking industries for sanding MDF, plywood, veneer, and solid wood materials. With high efficiency, stable performance, and precise sanding control, it helps manufacturers achieve high-quality finished products.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • Wide Belt Calibration Sanding Machine
  • Wide Belt Calibration Sanding Machine

product description

Model

ZDR-RP630

ZDR-RP1000

ZDR-RP1300

Max working width

630mm

1000mm

1300mm

Material thickness

2.5-120mm

2.5-120mm(option 2.5-160mm)

2.5-120mm(option 2.5-160mm)

Min. Working length

350mm

350mm

350mm

Feeding speed

6-30m/min

6-30m/min

6-30m/min

1# sanding belt speed

18m/min

18m/min

18m/min

2# sanding belt speed

14m/min

12m/min

12m/min

Size of sanding belt

650*1900mm

1020*2020mm

1320*2020mm

Main motor power

11kw,7.5kw

15kw,11kw

37kw,22kw

Total power

20.74kw

28.94kw

56.74kw

Working air pressure

0.5mpa

0.55mpa

0.55mpa

Volume of dust collecting

5000m³/h

5000m³/h

5000m³/h

Speed of dust collecting

25-30m/s

25-30m/s

25-30m/s

Overall dimension

(L*W*H)

1700*1100*2050mm

1700*1400*2050mm

2750*2200*2050mm

Weight

1300kg

2000kg

3200kg


Demo Video

Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit