20260512135201810

Four Sided Planer

Qingdao Zhongding Four Sided Planer Machine is a high-efficiency woodworking machine designed for simultaneous processing of the four surfaces of solid wood materials.
The Four Side Moulder Machine can complete top, bottom, left, and right side machining in one pass, including planing, sizing, profiling, and moulding. It is widely used in furniture manufacturing, wooden door production, flooring factories, decorative wood processing, and timber industries.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • Four Sided Planer

product description

Model

MB4015GX

MB4023DR

MB6030HR

Working width

20-150mm

20-230mm

40-300mm

Working thickness

8-120mm

8-150mm

10-200mm

Feeding speed

5-30m/min

5-30m/min

5-20m/min

Top/Bottom shaft power

4kw/3kw

7.5kw/4kw

11kw/5.5kw+11kw/7.5kw

Left/Right shaft power

3kw/3kw

5.5kw/5.5kw

7.5kw/5.5kw

Feeding power

2.2kw

3kw

3kw

Beam lifting power

0.37kw

0.75kw

0.75kw

Total power

15.57kw

26.25kw

51.75kw

Air pressure

0.25-0.3Mpa

0.25-0.3Mpa

0.25-0.3Mpa

Overall dimension

2400*1300*1500mm

3300*1600*1500mm

4150*2000*1650mm


Demo Video

Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit