20260512135201810

CNC Double Ended Tenoning Machine

Qingdao Zhongding CNC Double Ended Tenoning Machine is an advanced woodworking machine designed for high-precision double-end tenon processing of solid wood components.
The CNC Double End Tenoner adopts CNC control technology and a double-side machining structure to process both ends of wood components simultaneously, ensuring accurate dimensions, excellent consistency, and high production efficiency.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • CNC Double Ended Tenoning Machine

product description

This machine can drill, trim and mill grooves Can drill and mill 45° tenons

Processing tenon spacing

165MM~2200mm

X-axis servo power

1.5KW*2pcs

Processing tenon width

1~200mm

Y-axis servo power

1.5KW*2pcs

Processing tenon thickness

1~80mm

Z-axis servo power

0.4KW*2pcs

Processing tenon length

1~40mm

U-axis servo power

0.4KW*2pcs

Horizontal angle

-20° +45°

Spindle speed

8000~12000 r/min

Vertical angle

-15° +45°

Chamfering spindle speed

10000~18000 r/min

Working pressure

0.7 Mpa

Voltage

380 V

Main spindle power

5.5KW*2pcs

Total work rate

23.75KW

Chamfering spindle power

2.2 KW*2pcs

Mechanical Dimensions

4300mm*2250mm*1780mm

Horizontal axis servo power

0.75KW*1pcs

Mechanical weight

2100 KG


Demo Video

Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit