20260512135201810

Short Cycle Melamine Paper Lamination Hot Press Machine for MDF, Particle Board & Plywood

High-speed short cycle hot press machine for melamine paper lamination on MDF, particle board, and plywood. Fast cycle time, uniform temperature, and high automation.
Short Cycle High Efficiency: Fast closing and pressing cycle designed for rapid thermal bonding of melamine impregnated paper.
Uniform Heat & Pressure Distribution: Precision-ground heating platens with stainless steel cushion pads ensure surface quality without bubbles or defects.
Versatile Surface Finishing: Achieves high-gloss, matt, textured, embossed, or wood-grain finishes depending on the chosen press plate.
Automated Production Integration: Supports automatic vacuum loader, board feeder, alignment, and stacking systems for full automation.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • Short Cycle Melamine Paper Lamination Hot Press Machine for MDF, Particle Board & Plywood

product description

No.

Parameter name

Description

1

description

2000 Tons Pressure

2

The veneer method

Double-sided veneer

3

Direction of entry

broadwise

4

power

~35.2KW

5

Die press width

Upper hot pressing plate 1400*2600*160 + lower hot pressing plate 1400*2600*120

6

interlamellar spacing

250mm

7

Main cylinder (diameter * stroke)

Φ 360*250mm 8 pieces

8

Tightening cylinder (diameter * stroke)

Φ 80*260mm 4 pieces

9

System working oil pressure

≤25MPA

10

Temperature of hot press plate

≤250℃

11

The upper heat pressing plate adopts single layer temperature control

6 input, 6 output

12

The lower hot pressing plate adopts single layer temperature control

6 input, 6 output

13

Upper heat pressing plate lifting guide method

Synchronising rod

14

Control mode of electronic control system

PLC+ touch screen

15

heating medium

Heat conduction oil

16

Speed of entry and exit

Adjustable


Demo Video

Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit