20260512135201810

Plastic Waste Recycling Hot Press Machine for Sheet & Board Making

Industrial Hydraulic Hot Press Machine for Plastic Waste Recycling, Our Plastic Recycling Hot Press Machine is engineered to convert post-industrial and post-consumer plastic waste into high-value recycled sheets, panels, and molded products. Ideal for processing plastics such as HDPE, PP, PE, PS, ABS, and PVC, this heavy-duty press provides a cost-effective and sustainable solution for plastic waste management companies and eco-friendly manufacturers.
Equipped with precision-controlled heating platens and an advanced hydraulic system, the machine heats plastic flakes or regrind to its optimal melting point while applying high tonnage pressure to eliminate internal air pockets. The result is a high-density, structural-grade recycled plastic board widely used in construction, outdoor furniture, material handling pallets, and agricultural applications.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • Plastic Waste Recycling Hot Press Machine for Sheet & Board Making

product description

Machine Working Pressure

120 Ton

Working Hot Plate Size

1300*2500*42 mm

Max Service Opening

250 mm

Machine Press Layers

Four Layers

Motor Power

7.5 Kw+1.5 Kw

Heating Method

Electric Heating with Conduction Oil

Max Working Temperature

240 ℃


Demo Video

Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit