20260512135201810

200 Ton Hydraulic Hot Press Machine

High-performance 200 ton hot press machine for wood veneer and panel processing. Boost your furniture and plywood production efficiency with robust hydraulic force.
200-Ton Heavy-Duty Clamping Force: Ensures uniform pressure distribution and strong bonding performance.
Precise Temperature Control: Multi-zone temperature regulation for flawless surface finishing.
Robust Steel Structure: Heavy-frame design minimizes deformation for long-term industrial production.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • 200 Ton Hydraulic Hot Press Machine

product description

Item

Specification

Nominal Total Pressure

200 Tons

Hot Plates

4 pcs

Hot Plate Size

3000 × 2100 × 42 mm

Unit Pressure

3.17 kgf/cm²

Number & Diameter of Cylinders

10 pcs / Ø100 mm

Closing Speed

30 mm/s

Heating Method

Electric Heating with Heat Transfer Oil

Hot Plate Opening Method

Electric

Working Layers

3 Layers

Distance Between Hot Plates

100 mm

Rated Hydraulic Pressure

20 MPa

Cylinder Stroke

300 mm

Maximum Temperature

150°C

Installed Power – Hydraulic System

5.5 kW

Installed Power – Heat Transfer Oil System

3 kW

Installed Power – Heating System

81 kW

Overall Dimensions

4400 × 2100 × 2050 mm

Approx. Weight

15,400 kg


Demo Video

Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit