20260512135201810

PUR&EVA Straight Edge Banding Machine ZD450G1P1

High-performance PUR & EVA Double Glue Pot Automatic Edge Banding Machine for advanced furniture and woodworking production. The dual glue system allows quick switching between PUR waterproof bonding and EVA standard edge banding, ensuring excellent finishing quality for PVC, ABS, veneer and wood panels.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • PUR&EVA Straight Edge Banding Machine ZD450G1P1

product description

Model

Working Pressure

Total Power

Feeding Speed

Electric Lifting

Working Thickness

Working Length

Working Width

Edge Thickness

Overall Size

ZD450G1P1

0.6~0.8 Mpa

16.5 Kw

12-20 m/min

0.37 Kw

10-60 mm

≧150 mm

≧60 mm

0.4-3 mm

7985*900*1590 mm


ZD450G1P1 功能图示(可以合成一行)


  • PUR-top-glue
    PUR-top-glue
  • PUR-Glue-feeder
    PUR-Glue-feeder
  • Multi-Way-Edge-tape-feeing-System
    Multi-Way-Edge-tape-feeing-System
  • Edge tape feeder
    Edge tape feeder

Demo Video

Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit