20260512135201810

Straight&Beveling edge banding machine ZD450ZX

High-performance Straight & Bevel Automatic Edge Banding Machine for PVC, ABS, veneer and wood panel edge processing. With advanced automatic control, precise trimming and polishing functions, it provides perfect edge finishing solutions for cabinets, furniture and woodworking factories.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • Straight&Beveling edge banding machine ZD450ZX

product description

Model

Working pressure

Total power

Feeding speed

Panel edge thickness

Edge band thickness

Panel width

Panel length

Overall size

ZD450ZX

0.6MPa

28kw

Straight 15-20m/min

Oblique 15m/min

Straight 10-60mm

Oblique: 15-25mm

Straight 0.4-3.0mm Oblique 0.8-1.5mm

Straight ≥50mm

Oblique ≥70mm

≥80mm

10000*950*1850mm


流程图斜直1

流程图斜直2

斜直效果图1 (1)


  • 微信图片_20250928113325_864_17
  • P24
  • IMG_20221215_133649
  • e442fd043e818b33c862a78ee043a0b8
  • c5117596fbe1d0a23fb4a091f5ae224c

Demo Video

Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit