20260512135201810

Curved edge banding machine

High-performance Curve Edge Banding Machine designed for curved and irregular panel edge processing. With precise control, automatic operation and smooth finishing performance, it provides professional edge banding solutions for cabinets, customized furniture and modern woodworking production.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • Curved edge banding machine
  • Curved edge banding machine
  • Curved edge banding machine

product description

ModelKN620KN700
Total power5.7KW6.5kw
Glue pot capacity2600ml
Temperature of glue pot110℃-210℃
Air source pressure0.6~0.8Mpa
GlueEVA/PUR
Width of strips14-70mm
Thickness of strips0.5-3mm
Trimming plates thickness<14mm single trimming ,14-70mm double trimming up&down
Inner arc radius:≥20mm(Special operation sealable radius 4mm)
Edge banding speed0-20cm/s0-30cm/s
Copying speed0~12cm/s0~24cm/s
Air tank volume/2L
Head rotation angle15°
External suctionφ150mm air volume:9800m³/h
Type of edge stripPVC,Veneer,plastic,melamine,etc.
Packing dimensions1870*1400*1340mm(Half wooden case)1870*1400*1530mm(Half wooden case)
Gross weight500kg(Half wooden case)530 kg(Half wooden case)
AdvantagesPUR/EVA dual-purpose glue pot
Rubber pan one key row glue
The thickness of trimming plate is free from adjustment
Auxiliary automatic feeding
Laser precise docking
Edge sealing and trimming machine head can be rotated
Automatic acceleration and deceleration at corners

Demo Video

Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit