20260512135201810

HEAVY DUTY CNC BEAM SAW ZD380

CNC BEAM SAW designed for automatic and precise cutting of wood panels, MDF, plywood and laminate boards. With intelligent CNC control, automatic feeding system and high cutting accuracy, this panel saw machine is the ideal choice for furniture manufacturers, cabinet factories and professional woodworking production lines.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • HEAVY DUTY CNC BEAM SAW ZD380

product description

ProductCNC Beam Saw ZD380
ModelZD380
Cutting length≤3900mm
Sawing thickness≤120mm
Sawing width≤3900mm
Horizontal cut size≥5mm
Vertical cut size≥40mm
Dia. Of main saw blade400mm
Main saw shaft diameter75mm
Main saw speed3800rpm
Dia. of vice saw blade200mm
Diameter of secondary saw shaft50mm
Vice saw speed5200rpm
Sawing speed0-120m/min
Return speed0-120m/min
Saw shaft power18.5kw
Vice saw power2.2kw
Motor power of air floatation table3kw
Saw carriage servo motor1.8kw INOVANCE Servo
Pusher motor1.8kw INOVANCE Servo
TargetingAutomatic
Operation pressure0.6~0.7Mpa
Air floatation table size1870*540mm
Net weight6500kgs
Dimensions (L*W*H)7150*6250*1950mm
Cutting accuracy±0.1mm
Positioning accuracy0.02mm
The main saw and the auxiliary saw can be raised and lowered independently, and the lifting height can be automatically adjusted according to the sawing thickness.yes
The pressure beam is lifted by high-precision double-tie rod cylinders and ASP structure pilot one-way regulating valves, which can stop at any position to achieve automatic lifting positioning.yes


Demo Video

Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit