20260512135201810

CNC Beam Saw (Rear-Loading Model) ZD330

Feeding method: The board is automatically fed into the cutting area from the rear, which is suitable for large boards and batch processing.
Other cutting lengths can be customized.
CNC BEAM SAW designed for automatic and precise cutting of wood panels, MDF, plywood and laminate boards. With intelligent CNC control, automatic feeding system and high cutting accuracy, this panel saw machine is the ideal choice for furniture manufacturers, cabinet factories and professional woodworking production lines.
+86-532-85183166
+8618363917197
+8618363917197
zhongding15@qdzhongding.com
Request for Quotation
Request for Quotation
  • CNC Beam Saw (Rear-Loading Model) ZD330

product description

Technical Specification

Model

ZD330

Main saw motor power

18.5kw

Vice saw motor power

2.2kw

Cutting length

≤3350mm

Sawing thickness

≤120mm

Sawing width

≤3350mm

Horizontal cut size

≥5mm

Vertical cut size

≥40mm

Sawing speed

0-120m/min

Return speed

0-120m/min

Main saw blade diameter

400mm

Main saw shaft diameter

75mm

Main saw speed

3800r/min

Vice saw blade diameter

200mm

Diameter of vice saw shaft

50mm

Vice saw speed

5200r/min

Air floatation table specifications

1800*540mm-3

Motor power of air bearing table

4kw

Hydraulic lifting platform

2.2kw

Mechanical pusher servo motor

INOVANCE 1.8kw

Saw carriage servo motor

INOVANCE 1.8kw

Targeting

automatic

Sawing accuracy

±0.1mm

Air pressure

0.6-0.7Mpa

Machine size

9200*5700*1950mm

Weight

7500kg


Demo Video

Frequently Asked Questions

A:

We are a professional woodworking machinery manufacturer supplying a full range of equipment, including sliding table saw, CNC beam saw / panel saw, edge banding machine, CNC router, wood sanding machine, polishing machine, hot press machine, cold press machine and other woodworking equipment.
Our machines are widely used in furniture manufacturing, cabinet production, and woodworking workshops.

A:

A sliding table saw (panel saw) is used for precision cutting of wood panels such as MDF, plywood, and particle board.
It is widely used in furniture factories and cabinet production lines for straight cutting, angle cutting, and high-precision panel processing.

A:

A CNC beam saw / automatic panel saw is designed for high-efficiency cutting of large wood panels.
It is commonly used in industrial furniture production lines to improve cutting speed, accuracy, and automation level.

A:

An edge banding machine is used to cover exposed edges of wood panels with PVC, ABS, or veneer strips.
It is an essential machine in modern cabinet and furniture production, improving appearance, durability, and waterproof performance.

A:

Yes, our machines are widely used in complete furniture production lines, including cutting, edge banding, drilling, sanding, and pressing processes.
We can also provide customized production line solutions based on factory layout and production capacity.

A:

All woodworking machines come with a 12-month warranty.
During the warranty period, we provide free replacement parts for non-human damage and lifetime technical support.

A:

Yes, we provide:
⦁ Installation manuals and operation videos
⦁ Remote online technical support
⦁ On-site engineer service (for large production line projects)
This ensures customers can operate the machine smoothly after installation.

A:

Yes, we provide custom woodworking machine solutions, including:
⦁ Voltage (380V / 220V / 415V / 440V)
⦁ Working size customization
⦁ Automation level adjustment
⦁ Production line integration

A:

Standard machines such as sliding table saws and edge banding machines usually take 10–20 days.
Larger equipment such as CNC beam saws and production line machines may take 20–35 days depending on configuration.

A:

We are a professional woodworking machinery manufacturer in China, offering:
⦁ Stable machine quality for industrial use
⦁ Competitive factory direct price
⦁ Full range of woodworking machines
⦁ Customized solutions
⦁ Global export experience and technical support
Our machines are exported to Europe, North America, Middle East, Central Asia, Southeast Asia, Africa, and South America.

Have Questions? Talk to Our Experts!

Submit